The ‘Enhancement and Strengthening of Power Network in Eastern Region’ project encompasses various components, including the construction of several 230kV transmission lines such as Korerhat-Chowmuhani, Chowmuhani-Kachua, Kachua-Gazaria, Chowmuhani-Maijdee, and the LILO of Comilla(N)-BSRM line at the proposed Korerhat substation.
Skipper's involvement spans across various critical phases of the project lifecycle. Skipper has contributed to the design, supply, installation and commissioning of 400kV and 132kV towers of 6,770.36 metric tons. In addition, Skipper conducted the load testing of 2 new tower types, further cementing their commitment to the project's success.
By undertaking the bolstering of the transmission system in the region, this project transcends the mere enhancement of power transmission capabilities. It stands as a beacon of resilience against the challenges posed by climate change. By establishing a more robust and sustainable energy infrastructure, the project marks a significant stride towards ensuring the energy security and stability of Bangladesh's eastern landscape.