Supply of 115 kV, 150 Custom-Designed Structures with 20 Design Variants for a Project, USA
Supply of 115 kV, 150 Custom-Designed Structures with 20 Design Variants for a Project, USA

The customer required a DDP delivery with detailed design to be completed within 24 weeks for a project valued at $4.5 million USD, involving 150 structures and 20 unique designs. Despite the challenging timeline, delivery began in 20 weeks and was fully completed by week 24. The team submitted all key design documents—including Fabrication, Assembly, BOM drawings, PLS-Pole “.bak” files, and cage assembly drawings—within the first 3 weeks. Customer approvals were received in 4 weeks, enabling manufacturing of the entire order to be completed in the following 4 weeks. The shipment timeline included 7 weeks of sailing from the Indian port to the U.S. port, followed by 1 week of transit to the customer site.

product

Engineering

One of the world's largest integrated Transmission Tower manufacturing companies

Infrastructure

The company is also engaged in EPC Projects in Power Transmission & Distribution, Telecom infra and Railway Structures

Polymer Pipes

Skipper Limited is a national powerhouse in the Polymer Pipe business.

Skipper Limited

Registered Office

3A, Loudon Street, Kolkata- 700017, India