Power Grid Corporation of India Limited, headquartered at Saudamini, Plot No. 2, Sector-29, Gurugram-122, Haryana, awarded the project for the 765 kV DC Fatehgarh-II – Bhadla-II Transmission Line, covering an approximate route length of 180 km in Rajasthan.
As part of the BOI scope for this project, Skipper supplied a comprehensive range of critical components, including long rod insulators, hardware fittings, tower accessories, earthing materials, OPGW, and conductors. This project, valued at ₹525 crore, commenced on 1st September 2021, contributing significantly to strengthening the region’s high-voltage transmission infrastructure.
11-Nov-2025
Sustainability Initiatives (Skipper Adopts Argon-CO2 Gas Mix to Cut Carbon Emissions and Enhance Sustainability)
21-Nov-2025
Projects Commissioned(Supply of 330 kV and 500 kV Transmission towers for Project Energy Connect (PEC) - Transgrid, Australia)
21-Nov-2025
Projects Commissioned(Supply of 500 kV Transmission towers for Hermosa-San Jose Transmission Line, NGCP Philippines)
21-Nov-2025
Projects Commissioned (Supply of 500 kV Transmission towers for Colectora Substation, Colectora - Cuestecitas and Cuestecitas - La Loma Transmission Line, ISA Colombia)
21-Nov-2025
Projects Commissioned (Supply of 115 kV, 61 Poles with Designs Delivered Within Compressed Schedule, Canada)
21-Nov-2025
Projects Commissioned (Prototype Tower Fabrication and Load Testing for 500 kV Standard Transmission Towers, Sarawak Energy Berhad)
21-Nov-2025
Projects Commissioned (Prototype Manufacturing and Testing of 500 kV HVDC OHTL Towers for Interconnection Link, Saudi Electricity Company, Kingdom of Saudi Arabia)
21-Nov-2025
Projects Commissioned (Design and Support of 138 kV 2-Circuit Tangent Tower, CenterPoint Energy, United States of America)
3A, Loudon Street, Kolkata- 700017, India